MMI 2.33% 4.2¢ metro mining limited

2024 Production Progress, page-501

  1. 703 Posts.
    lightbulb Created with Sketch. 188
    CapesizeCapacity (DWT)Entry DateFill start dateInitial scheduled exit dateActual Exit DateLoading time (days) Daily Loading Rate Days in PortQuarter
    1Bulk Norway175,835 24/03/202427/03/20246/04/202412/04/20241610,990 19Q2
    2Berge Broad Peak 177,876 3/04/202412/04/202424/04/202426/04/20241412,705 23Q2
    3Jewel175,784 23/04/202426/04/20248/05/20247/05/20241115,980 14Q2
    4Zhi NV Star180,200 30/04/20247/05/202419/05/202417/05/20241018,020 17Q2
    5Bulk Norway175,835 13/05/202416/05/202425/05/202427/05/20241115,985 14Q2
    6Chang Geng Star 180,274 21/05/202424/05/20244/06/202411/06/20241810,015 21Q2
    7Berge Broad Peak 177,876 30/05/20248/06/202420/06/202421/06/20241313,683 22Q2
    8Wen Hua Star178,394 19/06/202419/06/202430/06/202429/06/20241017,839 10Q2
    9Berge Bintumani 177,890 26/06/202426/06/202411/07/20247/07/20241116,172 11Q3
    10Berge Triglav175,885 11/07/202412/07/202421/07/202426/07/20241412,563 15Q3
    11Avila180,076 19/07/20241/08/202410/08/202410/08/2024920,008 22Q3
    12Bei Ji Star180,180 20/07/202423/07/20242/08/20242/08/20241018,018 13Q3
    13Zhi NV Star180,200 25/07/20247/08/202418/08/202417/08/20241018,020 23Q3
    14Sunrise179,168 11/08/202414/08/202426/08/202423/08/2024919,908 12Q3
    15Great Qin176,104 23/08/202423/08/20241/09/2024
    16Wen Yuan Star181,429 29/08/2024
    17Bei Ji Star180,180 4/09/2024
    18
    19
    20
    21Total2,853,006
    22

    23Newcastle MaxCapacity (DWT)Entry DateFill start dateInitial scheduled exit dateActual Exit DateLoading time (days)Daily Loading RateDays in PortQuarter
    24China Venture210,269 3/07/20245/07/202414/07/202417/07/20241217,522 14Q3
    25
    26
    27
    28210,269
    29
    30Total Q21,422,074
    31Total Q31,821,381
    32Total Q4-
    33Total3,243,455
    34
    352023 - PRIOR YEAR
    36Total Q21,269,000
    37Total Q31,610,000
    38Total Q41,688,000
    39Total4,567,000

    Hi all - lots of good discussion this morning. Been a slow couple of days with barges as noted - this is more likely to be due to some planned maintenance than anything else. The reason I say that, is they have no timing pressure at the moment given the queue is looking well managed to keep the 7 day turnaround going and a slower turnaround on the Great Qin won't hurt as it will still leave within 14 days so no issues from a demurrage POV. Bei Ji Star joins the queue again (thanks @Chrisdog123) and ensures this will be a record quarter and the best production rate ever.

    Based on my timing, they should be able to fill 2 further ships after the BJS and therefore reaching the 2.2m in the quarter. I for one have been actively buying the last few days and have doubled my holding in the past month (including another 1,000k this morning). Barge movements have recommenced with 2 loaded barges going out this morning
    Last edited by Arrow666: 28/08/24
 
watchlist Created with Sketch. Add MMI (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.