MMI 2.33% 4.2¢ metro mining limited

CapesizeCapacity (DWT)Entry DateFill start dateInitial scheduled...

  1. 703 Posts.
    lightbulb Created with Sketch. 188
    CapesizeCapacity (DWT)Entry DateFill start dateInitial scheduled exit dateActual Exit DateLoading time (days) Daily Loading Rate Days in PortQuarter
    1Bulk Norway175,835 24/03/202427/03/20246/04/202412/04/20241610,990 19Q2
    2Berge Broad Peak 177,876 3/04/202412/04/202424/04/202426/04/20241412,705 23Q2
    3Jewel175,784 23/04/202426/04/20248/05/20247/05/20241115,980 14Q2
    4Zhi NV Star180,200 30/04/20247/05/202419/05/202417/05/20241018,020 17Q2
    5Bulk Norway175,835 13/05/202416/05/202425/05/202427/05/20241115,985 14Q2
    6Chang Geng Star 180,274 21/05/202424/05/20244/06/202411/06/20241810,015 21Q2
    7Berge Broad Peak 177,876 30/05/20248/06/202420/06/202421/06/20241313,683 22Q2
    8Wen Hua Star178,394 19/06/202419/06/202430/06/202429/06/20241017,839 10Q2
    9Berge Bintumani 177,890 26/06/202426/06/202411/07/20247/07/20241116,172 11Q3
    10Berge Triglav175,885 11/07/202412/07/202421/07/202426/07/20241412,563 15Q3
    11Avila180,076 19/07/20241/08/202410/08/202410/08/2024920,008 22Q3
    12Bei Ji Star180,180 20/07/202423/07/20242/08/20242/08/20241018,018 13Q3
    13Zhi NV Star180,200 25/07/20247/08/202418/08/202417/08/20241018,020 23Q3
    14Sunrise179,168 11/08/202414/08/202426/08/202423/08/2024919,908 12Q3
    15Great Qin176,104 23/08/202423/08/20241/09/2024
    16Wen Yuan Star181,429 29/08/2024
    17Bei Ji Star180,180 4/09/2024
    18
    19
    20
    21Total2,853,006
    22

    23Newcastle MaxCapacity (DWT)Entry DateFill start dateInitial scheduled exit dateActual Exit DateLoading time (days)Daily Loading RateDays in PortQuarter
    24China Venture210,269 3/07/20245/07/202414/07/202417/07/20241217,522 14Q3
    25
    26
    27
    28210,269
    29
    30Total Q21,422,074
    31Total Q31,821,381
    32Total Q4-
    33Total3,243,455
    34
    352023 - PRIOR YEAR
    36Total Q21,269,000
    37Total Q31,610,000
    38Total Q41,688,000
    39Total4,567,000

    Hi all - lots of good discussion this morning. Been a slow couple of days with barges as noted - this is more likely to be due to some planned maintenance than anything else. The reason I say that, is they have no timing pressure at the moment given the queue is looking well managed to keep the 7 day turnaround going and a slower turnaround on the Great Qin won't hurt as it will still leave within 14 days so no issues from a demurrage POV. Bei Ji Star joins the queue again (thanks @Chrisdog123) and ensures this will be a record quarter and the best production rate ever.

    Based on my timing, they should be able to fill 2 further ships after the BJS and therefore reaching the 2.2m in the quarter. I for one have been actively buying the last few days and have doubled my holding in the past month (including another 1,000k this morning). Barge movements have recommenced with 2 loaded barges going out this morning
    Last edited by Arrow666: 28/08/24
 
watchlist Created with Sketch. Add MMI (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.