ADO 0.00% 2.0¢ anteotech ltd

I think in this context "Practical completion" means the plant...

  1. 124 Posts.
    lightbulb Created with Sketch. 22
    I think in this context "Practical completion" means the plant is physically built but not yet calibrated. No doubt there are many settings etc and for consistency of batches will need to be tested multiple times. Much better to System Test now rather than during a client order. IMO DYOR
 
watchlist Created with Sketch. Add ADO (ASX) to my watchlist
(20min delay)
Last
2.0¢
Change
0.000(0.00%)
Mkt cap ! $49.36M
Open High Low Value Volume
2.0¢ 2.1¢ 2.0¢ $25.66K 1.278M

Buyers (Bids)

No. Vol. Price($)
5 2392933 2.0¢
 

Sellers (Offers)

Price($) Vol. No.
2.1¢ 448141 6
View Market Depth
Last trade - 16.10pm 27/06/2024 (20 minute delay) ?
ADO (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.