ADO 0.00% 2.1¢ anteotech ltd

2024 - The year of ADO, page-65

  1. 17 Posts.
    The Pilot plant will be able to produce 20k liters annually. Once we scale that up to 80k liters is it still considered a pilot plant? Would 80k even be enough to have our product in the entire range of an EV manufacturer? How soon would we need to be constructing another full-production plant that can produce the sought of numbers we would be needing to actually meet this demand?
 
watchlist Created with Sketch. Add ADO (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.