...and to put it in perspective, the 1 million oz resource at Tengrela is from 1km of the current 4.5km of drilling - this does not include the extension of 4.5km to the north.
“absolute monster!!”, your words not mine. But it does look promising at this early stage.
Try and keep the noise low because the sp won’t stay here for too much longer: Canada listing + drills going crazy on abundant ground + take over speculation = accumulation over.
- Forums
- ASX - By Stock
- PRU
- 20m at 65.5g/t au from 58m at tengrela
20m at 65.5g/t au from 58m at tengrela , page-5
-
- There are more pages in this discussion • 6 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add PRU (ASX) to my watchlist
(20min delay)
|
|||||
Last
$2.59 |
Change
0.240(10.2%) |
Mkt cap ! $3.564B |
Open | High | Low | Value | Volume |
$2.51 | $2.60 | $2.48 | $20.56M | 8.065M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 280 | $2.58 |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
$2.59 | 88930 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 280 | 2.580 |
4 | 61039 | 2.570 |
2 | 30490 | 2.560 |
2 | 30490 | 2.550 |
2 | 30490 | 2.540 |
Price($) | Vol. | No. |
---|---|---|
2.590 | 2226 | 1 |
2.600 | 91629 | 12 |
2.610 | 61555 | 5 |
2.620 | 40846 | 3 |
2.630 | 8456 | 1 |
Last trade - 16.10pm 13/09/2024 (20 minute delay) ? |
Featured News
PRU (ASX) Chart |
The Watchlist
LPM
LITHIUM PLUS MINERALS LTD.
Simon Kidston, Non--Executive Director
Simon Kidston
Non--Executive Director
SPONSORED BY The Market Online