- Release Date: 30/05/14 10:30
- Summary: GENERAL: DOW: 78th Waratah Train enters passenger service
- Price Sensitive: No
- Download Document 2.85KB
DOW 30/05/2014 08:30 GENERAL REL: 0830 HRS Downer EDI Limited GENERAL: DOW: 78th Waratah Train enters passenger service Media/ASX and NZX Release 29 May 2014 78TH WARATAH TRAIN ENTERS PASSENGER SERVICE Downer EDI Limited (Downer) announced today that the 78th Waratah train had entered into passenger service on the Sydney rail network. The Chief Executive Officer of Downer, Grant Fenn, said he was extremely proud that Downer had designed and manufactured a fleet of world class passenger trains for the people of New South Wales. "The Waratah trains are very popular with train commuters and crews because they provide first class comfort and accessibility, advanced safety and security and smart technology. They have become the new transport icon for New South Wales and the benchmark for passenger trains in Australia," Mr Fenn said. "Importantly, the performance of the Waratah trains has exceeded all expectations. A key reason for this achievement is the quality of the train design and the successful integration of the many complex systems that make up the trains. "Both the design and the systems integration was done by Downer in Australia and a significant amount of the manufacturing was also performed in Australia, at Downer's Cardiff facility near Newcastle. This is testament to the capability of Downer's rail business and the Australian rolling stock supply industry." The Waratah trains now make up around 40% of Sydney's passenger train fleet and they will be the backbone of the Sydney rail network for many years to come. "Downer has overcome numerous obstacles to deliver the Waratah fleet and this is due to the hard work, persistence and professionalism of the project team," Mr Fenn said. "We were determined to work constructively with Transport for NSW to get the job done, break records for train delivery in Australia and set a new benchmark for program recovery worldwide. I believe we have succeeded in achieving these goals and I thank and congratulate everyone involved, including the teams at Reliance Rail, Transport for NSW and the State Government." As part of the Waratah Train Project, Downer has delivered 78 passenger trains (626 carriages), a state-of-the-art maintenance facility at Auburn and simulators for crew training. Downer also has a contract to maintain the Waratah fleet for 30 years. For further information please contact: Michael Sharp, Group Head of Corporate Affairs and Investor Relations +61 439 470145 Luke Thrum, Manager Investor Relations +61 459 828720 Downer EDI Limited (www.downergroup.com) provides comprehensive engineering and infrastructure management services to the public and private Minerals & Metals, Oil & Gas, Power, Transport Infrastructure, Telecommunications, Water and Property sectors across Australia, New Zealand and the Asia Pacific region. End CA:00251042 For:DOW Type:GENERAL Time:2014-05-30 08:30:07
- Forums
- NZX - By Stock
- DOW
- Ann: GENERAL: DOW: 78th Waratah Train enters pass
Ann: GENERAL: DOW: 78th Waratah Train enters pass
Featured News
Add DOW (NZSX) to my watchlist
|
|||||
Last
48.4¢ |
Change
0.000(0.00%) |
Mkt cap ! n/a |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
DOW (NZSX) Chart |
Day chart unavailable
The Watchlist
FHE
FRONTIER ENERGY LIMITED
Adam Kiley, CEO
Adam Kiley
CEO
SPONSORED BY The Market Online