- Release Date: 08/10/14 09:07
- Summary: GENERAL: VCT: Investigation into cause of Penrose substation fire
- Price Sensitive: No
- Download Document 1.24KB
VCT 08/10/2014 09:07 GENERAL REL: 0907 HRS Vector Limited GENERAL: VCT: Investigation into cause of Penrose substation fire Transpower and Vector are jointly to conduct an investigation into the cause of the Penrose fire and outage in the early morning of 5 October 2014. In addition to this investigation, both Transpower and Vector will be co-operating fully and providing all assistance possible to the inquiry that the Minister of Energy and Resources has requested the Electricity Authority to undertake. The investigation into the outage will be undertaken by respected independent industry experts appointed separately by Transpower and Vector along with an overseas cable expert. The Fire Service will also provide input with respect to the forensic analysis on the fire itself. The investigation will cover: - What was the cause of the event on October 5 2014; - The extent and impact of the outage; - Risk mitigations and whether these operated according to design; - Key learnings and recommendations for the future. A copy of the Minister of Energy and Resources' request for the inquiry can be found at www.beehive.govt.nz/release/minister-announces-power-outage-inquiry. ENDS End CA:00256188 For:VCT Type:GENERAL Time:2014-10-08 09:07:28
- Forums
- NZX - By Stock
- VCT
- Ann: GENERAL: VCT: Investigation into cause of Penrose substation fire
Ann: GENERAL: VCT: Investigation into cause of Penrose substation fire
Featured News
Add VCT (NZSX) to my watchlist
The Watchlist
MGU
MAGNUM MINING AND EXPLORATION LIMITED
Neil Goodman, MD
Neil Goodman
MD
SPONSORED BY The Market Online