Ann: Drill core assays significantly increase Cu grade at Moubiri

  1. 1,961 Posts.
    lightbulb Created with Sketch. 38
    26
    th November, 2014
    ASX Release,
    By e-lodgement
    First drill core assays significantly upgrade copper grades at Moubiri
    Highlights
    • Assays significantly upgrade copper grades in majority of drill holes.
    • Main “DSO” mineralised zone (ZK130401) increased width and grade:
    o 8.55m (down hole) @ 11.9% Cu, 29.6% Pb, 19.4% Zn and 159.2g/t Ag
    • Significant increase in copper grade in the sandstone unit:
    o 17m @ 5.1% Cu (XRF result) increased to 16.7m @ 11.0% (assay result)
    o 9.4m @ 3.8% Cu (XRF result) increased to 9.5m @ 6.2% (assay result)
    o 12.4m @ 5.6% Cu (XRF result) increased to 15.7m @ 9.0% (assay result)
    AusAmerican Mining Limited (ASX: AIW) (“AusAmerican” or “the company”) is pleased to report
    the first drill core assay results from the Moubiri due diligence program.
    Shenglong Investments International Ltd (“Shenglong”) previously drilled 14 diamond core holes
    for a total of 2,688 metres during 2013 of which 2 key holes intercepted the Moubiri production
    ore body. As part of AusAmerican’s due diligence program the company has logged the drill holes,
    supervised analyses by handheld XRF and the cutting/sampling of the drill core. The preliminary
    XRF results were released on 23rd Oct. The drill core was assayed by Acme Laboratories(Vancouver)
    by 4 acid digest with an ICP finish and has consistently returned higher copper grades than
    originally published. Major intersections are as follows:
    Hole Id From To Interval (m) True Width (m) Cu % Pb % Zn % Ag g/t
    ZK130401 38.4 55.1 16.7 7.3 11.0 0.6 2.1 33.5
    ZK130401 85.1 93.65 8.55 3.8 11.9 29.6 19.4 159.2
    MZK004 88.0 97.5 9.5 4.2 6.2 - - 10.2
    MZK007 7.0 11.0 4 1.8 13.2 - - 20.5
    MZK007 25.9 41.6 15.7 6.9 9.0 - - 116.4
    MZK011 27.0 59.0 32 14.1 2.0 - - -
    Table 1: Major drill intersections from Moubiri diamond drill core
    The results again give significant credibility to the company'sshort term business plan in increasing
    production at Moubiri over the next six months to 200-250 tonnes per day with all key due
    diligence results to date confirming the company's current production model.
    Sincerely,
    Jim Malone
    CEO/Company Secretary
 
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.
(20min delay)
Last
0.1¢
Change
0.000(0.00%)
Mkt cap ! $3.402M
Open High Low Value Volume
0.1¢ 0.1¢ 0.1¢ $0 12

Buyers (Bids)

No. Vol. Price($)
3 3598601 0.1¢
 

Sellers (Offers)

Price($) Vol. No.
0.2¢ 146567681 48
View Market Depth
Last trade - 11.07am 12/08/2025 (20 minute delay) ?
OB1 (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.