The Port looks good and it should easily handle bauxite loading, without too much difficulty. The open area is big enough for a substantial stockpile. Initially some re-handling could be done in the stockpile area to feed the existing shiploading conveyor, to limit initial Capex. Stacker / reclaimer etc could be added later, when the cash starts to flow.
My confidence is restored
QBL Price at posting:
1.7¢ Sentiment: None Disclosure: Held