VCT 0.55% $3.65 vector limited (ns) ordinary shares

Ann: QUARTER: VCT: Operational performance for the nine months ended 31 March

  1. lightbulb Created with Sketch. 2
    • Release Date: 23/04/15 08:30
    • Summary: QUARTER: VCT: Operational performance for the nine months ended 31 March
    • Price Sensitive: No
    • Download Document  2.43KB
    					VCT
    23/04/2015 08:30
    QUARTER
    PRICE SENSITIVE
    REL: 0830 HRS Vector Limited
    
    QUARTER: VCT: Operational performance for the nine months ended 31 March
    
    Nine months ended 31 March
    % change
     2015 2014
    
    Electricity
    
    Customers1, 2  542,826 537,757 0.9%
    New connections
    Net movement in customers3  5,626
    3,672 4,504
    3,324 24.9%
    10.5%
    Volume distributed (GWh)  6,266 6,143 2.0%
    SAIDI (minutes) - 12 months to 31 March4, 10
      Normal operations  155 141  9.9%
      Extreme events11 339 10 3,290.0%
      Total    494 151 227.2%
    
    Gas Transportation
    
    Distribution customers1, 5  162,252 158,735   2.2%
    New distribution connections
    Net movement in distribution customers3  2,905
    2,514 2,899
    1,783 0.2%
    41.0%
    Distribution volume (PJ)  16.8 16.3   3.1%
    Transmission volume (PJ)6  84.3 82.8 1.8%
    
    Gas Wholesale
    
    Natural gas sales (PJ)7  16.0 18.5    (13.5%)
    Gas liquid sales (tonnes)8 52,095 52,742  (1.2%)
    Liquigas LPG tolling (tonnes)9 141,278 123,505 14.4%
    
    Technology
    
    Electricity: smart meters1, 12 911,961 638,517 42.8%
    
    1. As at 31 March.
    2. The electricity customer number as at 31 March 2014 has been restated to
    remove 4,799 ICPs following a data cleanse by retailers.  There was no
    consumption for any of these ICPs in the current period.
    3. Net number of customers added during the period, includes disconnected,
    reconnected and decommissioned ICPs.
    4. Regulatory year - 12 months to 31 March.
    5. Billable ICP's.
    6. Billable volumes.
    7. Excludes gas sold as gas liquids as these sales are included within the
    gas liquids sales tonnages.
    8. Total of retail and wholesale LPG and natural gasoline.
    9. Includes product tolled in Taranaki and further tolled in the South
    Island.
    10. SAIDI (minutes) for 12 months ended 31 March 2015 is an unaudited value
    and subject to change.
    11.  In the 12 months to 31 March 2015 we have experienced four extreme
    events.  Three were caused by extreme weather conditions with wind speeds
    peaking at 78 km/h in April, 104 km/h in June and 109 km/h in July. These
    weather events caused widespread damage and were the highest winds Auckland
    had experienced in the last 10 years.  The fourth extreme event was caused by
    a fire in the cable trench at the Penrose Grid Exit Point.
    12. On 1 December 2014, Vector acquired Arc Innovations Limited, Meridian
    Energy's smart metering business which increased the number of smart meters
    by 139,118.
    
    The Excel version can be found at: http://vector.co.nz/news
    End CA:00263431 For:VCT    Type:QUARTER    Time:2015-04-23 08:30:58
    				
 
watchlist Created with Sketch. Add VCT (NZSX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.