as far as linc goes thats the value of the deal, just with defered payments - I'm not arguing the fact that EER should be getting 30c or 17c like hancock did of GVK but a 50% discount to the hancock deal would be a fair value at 8.5c at this stage - 2c is just to cheap anyway you look at it.
as far as the quality goes i have said all along EER's coals would show synergies in blending with the Galilee coals for maximum profit or go it alone and supply to asian Fluidized bed combustion bolers - they are designed to run on lower quality stuff;
here goes;
To blend waratahs prize seams (DU and DL seams) with EER's coal at a ratio of 2 waratah tonnes to 1 EER tonnes; (that's EER at F1.60 F/S and galilee coals at F1.50 F/S)