EER 0.00% 3.6¢ east energy resources limited

EER's cash cost by referring to waratah coals operating cost...

  1. 2,917 Posts.
    EER's cash cost by referring to waratah coals operating cost estimate.

    here goes;

    Table 1.6: Operating Cost Estimate (AUD)

    (AUD/Tonne)

    Average Mining Cost/ROM Tonne = 13.71
    (EER's would be cheaper then this considering it's 2bt all open cut/close to surface)

    Raw Coal Handling/ROM Tonne = 0.50
    Coal Preparation/ROM Tonne = 2.00
    Tailings and Rejects Disposal/ROM Tonne = 0.30
    Product Coal Handling/Product Tonne = 0.25
    Product Coal Cost Loaded on Rail (FOR) = 16.76

    Rail Transport/Product Tonne = 4.54
    (waratah's cost 0.01c p/t p/km - EER cost 0.02c p/t p/km x 700km) $14.00
    Port Handling - Shiploading/Product Tonne =5.00
    Royalties @ 7% of AUD 80 Sell Price = 5.60


    Cost per Tonne Loaded (FOB) = $41.36



 
watchlist Created with Sketch. Add EER (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.