Yep i definitely agree that patience is the key here.
We've just got to remember that previous drilling at this BZ zone has already produced results like 17.7m @ 100.3 g/t Au at an interval of 59m to 76.7m, with the hole ending at 76.7m
This hole ends with 100.3 grams of mineralisation and in about a week we'll find out whats below this point.