10mc .. I assume this post was tongue in cheek? Yes they do seem to have the vessel to do the job now which is a good thing.
My concern now is that there will be a knee jerk reaction to all these problems in way of a complete redesign of the mooring and riser system. That could be a disaster for this project. I keep banging on about the relationship between the robustness (if there is such a word) of the technical solution, the cost, the management on site required to make it work and the worst case production profile. If they spend too much money on the mooring system the project could lose money. This is the bottom line. We do not want another NW Palawan failure.
That would be a serious blow to confidence in the Philippines oil industry.
3 cheers to GPC if they get this rght!
- Forums
- ASX - By Stock
- 3 cheers for gpc
10mc .. I assume this post was tongue in cheek? Yes they do seem...
-
- There are more pages in this discussion • 59 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add NDO (ASX) to my watchlist
(20min delay)
|
|||||
Last
81.0¢ |
Change
0.005(0.62%) |
Mkt cap ! $184.7M |
Open | High | Low | Value | Volume |
82.0¢ | 82.0¢ | 81.0¢ | $85.42K | 105.4K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 12870 | 79.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
81.0¢ | 562 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 12870 | 0.790 |
1 | 250 | 0.785 |
2 | 5250 | 0.780 |
1 | 663 | 0.755 |
2 | 10914 | 0.700 |
Price($) | Vol. | No. |
---|---|---|
0.810 | 562 | 1 |
0.830 | 29247 | 2 |
0.880 | 2000 | 1 |
0.900 | 15000 | 1 |
0.950 | 9500 | 2 |
Last trade - 13.49pm 06/11/2024 (20 minute delay) ? |
Featured News
NDO (ASX) Chart |