KAR 0.93% $1.61 karoon energy ltd

30mmcfg/d!!! on constrained euipt!!!, page-17

  1. 6,162 Posts.
    lightbulb Created with Sketch. 52
    Likewise i think we can assume at the very least we have 70 metres of net sand...

    perforated interval of 70 metres between 4904-4974 metres.

    This would be my interpetation and that is also a significant number...as someone alluded to the p-90 3 tcf might even get a revision before the next well!
 
watchlist Created with Sketch. Add KAR (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.