MAN 3.13% 3.3¢ mandrake resources limited

As per the investor presentation on 4/3 was confirmed target is...

  1. 135 Posts.
    lightbulb Created with Sketch. 65
    As per the investor presentation on 4/3 was confirmed target is drill ready and drilling to commence in March. Assume is RC rig and given initially only 3 holes being drilled there will only be one rig onsite. Either hold up getting the drill rig there or perhaps they already drilling and will report Hand held XRF assay upon completion of these first three holes. Seems a given we will hit NI,Cu,Fe sulphides given rock chip sampling and the 3 holes drilled by Australian Anglo American back in the late 70's. This will all be very positive but then must wait for actual lab assays to report on the all important PGEs that we all hoping for
    Fingers crossed rig is onsite and ready to start drilling. Still a bit of a wait for actual assay results though. Sometime in June iam guessing.
    u
    Drilling to commence March 2021 at the highly prospective
    Newleyine PGE-Ni-Cu target, located 30km from Chalice’s exciting
    Julimar discovery – First company to drill a Julimar-style EM target
    following the Chalice discovery in early 2020
    March 2021 Presentation | ASX: MAN
    Drill Ready
    4
    M
 
watchlist Created with Sketch. Add MAN (ASX) to my watchlist
(20min delay)
Last
3.3¢
Change
0.001(3.13%)
Mkt cap ! $20.35M
Open High Low Value Volume
3.4¢ 3.4¢ 3.2¢ $31.63K 958.3K

Buyers (Bids)

No. Vol. Price($)
7 2894524 3.2¢
 

Sellers (Offers)

Price($) Vol. No.
3.3¢ 164207 1
View Market Depth
Last trade - 16.10pm 06/06/2024 (20 minute delay) ?
Last
3.3¢
  Change
0.001 ( 3.13 %)
Open High Low Volume
3.3¢ 3.3¢ 3.3¢ 525277
Last updated 13.48pm 06/06/2024 ?
MAN (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.