Meeting Friday 3rd of May?
Either Wednesday 3rd May or Friday 5th May.
Very sloppy to release this, although dates and timelines have not been a strong suit to date with this project.
The $1.5M is no longer conditional of the MDL, does this mean the MDL is likely to take a lot longer ?