eni have cased down to 3,818 and on report 12 indicated they would run a wiper trip to condition the hole. there's probably some caking or influx of the silty section.
Not dissimilar to what happened at Gurame SE-1X except it was probably a shale section which prevented casing the first time round.
I imagine eni have taken the time to interpret logs (given the perf intervals are still undecided) and will move to ream and case the HS-1 well fairly quickly.
what are your thoughts on condensate expectations?
MEO Price at posting:
23.5¢ Sentiment: LT Buy Disclosure: Held