MEO 0.00% 0.0¢ meo australia limited

365m gas bearing sands, page-39

  1. 194 Posts.
    lightbulb Created with Sketch. 30
    I'm not sure why people are saying GWC was not intersected - TD was always going to be when GWC intersected. Drill report 11 says TD was determined at 4454m - why would this not mean the same as TD being determined by intersecting GCW in drill report 10?

    From Report 10:
    The forward plan is to drill to the final Total Depth (TD) as determined by intersecting the interpreted gas water contact. Upon reaching TD, A comprehensive formation evaluation program will be conducted.

    From Report 11:
    Since the last report, 216mm (8 ½”) hole had been drilled from 4,358.6m to 4,454mMDRT (metres Measured Depth below Rotary Table) which the operator has determined to be Total Depth (TD).
 
watchlist Created with Sketch. Add MEO (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.