Hi all,
I don't recall this youtube 3D video of our mine, being posted on here before, I'm sorry if it has been posted on here before, but the way it is of late, I think its the only way we will see our plant being completed.lol
Anyway I'm still here, just waiting for things to start up at our mine.....sometime this year.....or is it next year!
A 3D simulation model developed by Ceenex, of our planned Boikarabelo Mine using the latest Simio rapid modeling 3D discrete event simulation software. The actual plant block plan served as a background for the model, with model objects placed according to actual design location. Apart from model validation through visualization, this proved valuable in conveying the model configuration to key stakeholders.
The youtube link to it is below.
http://www.youtube.com/watch?v=hy2rLz8CKDw&feature=youtu.be
http://www.simio.com/resources/white-papers/Simulation-Analysis-of-the-Coal-Processing-Plant-of-Resgen-Mine.pdf
Good luck to all that hold RES
Add to My Watchlist
What is My Watchlist?