PAGE 12.
M2M Connectivity estimates that there are more than 1m devices/units in total that will be affected nationally.
Only changing the SIM will not work as the device will need the 3G chipset replaced with a 4G chipset in order to work.
According to NBN data, it is estimated there are 286,000 IoT monitoring devices that will require replacement over the three-year time frame from now. These devices include alarms, safety pendants and alert systems.
The cost for replacement is expected to be approximately $96m and is likely to be funded through corporates, such as Telstra, in a similar way to how the transition will occur for the mobile phone market.
https://www.hsctg.com.au/wp-content/uploads/2021/06/MST-Access-HSC-Initiation-Report-11Jun21-1.pdf
- Forums
- ASX - By Stock
- TAL
- 3G network shutdown - Telstra
3G network shutdown - Telstra, page-3
-
-
- There are more pages in this discussion • 2 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
NEWS
Antler Copper Project hits major permitting milestone – air quality permit advances to final review
Add TAL (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.7¢ |
Change
0.000(0.00%) |
Mkt cap ! $18.02M |
Open | High | Low | Value | Volume |
0.7¢ | 0.7¢ | 0.7¢ | $2.455K | 350.7K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
3 | 829262 | 0.7¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.8¢ | 3975493 | 6 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 700036 | 0.007 |
6 | 2652999 | 0.006 |
5 | 3500000 | 0.005 |
2 | 1300000 | 0.004 |
2 | 1500000 | 0.003 |
Price($) | Vol. | No. |
---|---|---|
0.008 | 2975493 | 5 |
0.009 | 1583333 | 3 |
0.010 | 2576180 | 2 |
0.011 | 799859 | 3 |
0.012 | 1804500 | 4 |
Last trade - 15.58pm 04/10/2024 (20 minute delay) ? |
Featured News
TAL (ASX) Chart |