RDS 0.00% 0.3¢ redstone resources limited

Drill rig and crew needs to be secured for the remaining 5300m...

  1. 1,509 Posts.
    lightbulb Created with Sketch. 331
    Drill rig and crew needs to be secured for the remaining 5300m of deeper RC drilling at EM5, Hopefully news before xmas on a rig. remembering this target (EM5) has returned 95m of continuous mineralisation of .006% Cu. This is a promising target as all other high grade hits to date at Tollu further south have been all vein hosted.
 
watchlist Created with Sketch. Add RDS (ASX) to my watchlist
(20min delay)
Last
0.3¢
Change
0.000(0.00%)
Mkt cap ! $2.776M
Open High Low Value Volume
0.0¢ 0.0¢ 0.0¢ $0 0

Buyers (Bids)

No. Vol. Price($)
20 23316190 0.2¢
 

Sellers (Offers)

Price($) Vol. No.
0.3¢ 1364999 1
View Market Depth
Last trade - 16.12pm 15/11/2024 (20 minute delay) ?
RDS (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.