Jax,
If the basket falls through you lose all your eggs, very high risk!
I'm envisioning small projects to become operational one after the other. I feel that the first projects to go to production need to be the most beneficial because as you say, QMN can't focus on it all simultaneously at this point in time. Small production ideally, will put QMN in a position where it can have a positive cash flow and get more projects to production and focus on main project White Ranges to production. All whilst limiting/eliminating further cap raise/dilution.
Jax,If the basket falls through you lose all your eggs, very...
Add to My Watchlist
What is My Watchlist?