Central held back in Amadeus
Monday, 4 October 2010
CENTRAL Petroleum will have to wait a little longer to determine the commercial potential of the Johnstone West-1 well in the Amadeus Basin after flow testing of the well was delayed.
The company said it had to delay the flow testing due to an electro-mechanical malfunction of a bridge plug.
The bridge plug is designed to isolate the zone of interest, however the plug didnt seat in the correct position.
Central is attempting to retrieve the plug but if retrieval fails, the company will mill the plug to remove it.
The company added that the flow testing of the oil shows in the Lower Stairway sandstone of the JW-1 is expected to be completed early in the coming week.
Central has said it believes the positive results from the well in EP 115 could lead to a new Amadeus Basin oil and gas province.
- Forums
- ASX - By Stock
- 4/10/10 update 'petroleum news'
Central held back in AmadeusMonday, 4 October 2010CENTRAL...
-
- There are more pages in this discussion • 1 more message in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add CTP (ASX) to my watchlist
(20min delay)
|
|||||
Last
5.2¢ |
Change
-0.003(5.45%) |
Mkt cap ! $38.48M |
Open | High | Low | Value | Volume |
5.2¢ | 5.2¢ | 5.2¢ | $35.73K | 687.1K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 550000 | 5.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
5.2¢ | 99854 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 550000 | 0.050 |
1 | 280000 | 0.049 |
3 | 1230000 | 0.048 |
1 | 100000 | 0.046 |
1 | 60000 | 0.045 |
Price($) | Vol. | No. |
---|---|---|
0.052 | 69854 | 1 |
0.055 | 11000 | 1 |
0.060 | 210909 | 3 |
0.063 | 32737 | 1 |
0.067 | 10000 | 1 |
Last trade - 16.10pm 05/07/2024 (20 minute delay) ? |
Featured News
CTP (ASX) Chart |