Basic Engineering Design for Phase 2 of the LAMP was completed during the quarter, and the tender process for the engineering, construction, procurement and commissioning contract is underway.
Thats an extract from the last Qrtly report.(which all Lynasheads have read).
This after confirming the Sojitz contract was done and dusted..and the money was already being used as per above.
Phase 1 fully funded by LYC.
Also after welcoming the IAEA experts involvement.
We know they are advertising publically for Staff.
The Malawi site is being refurbished,and arranging connections for water,gas.Drilling to start by 3 rd qtr.
Concentration plant crushing..Designor ores..after successfull testing lower grade ore processing.
Anyone would think theres nothing wrong.
- Forums
- ASX - By Stock
- $4 club
LYC
lynas rare earths limited
Add to My Watchlist
0.84%
!
$8.27

Basic Engineering Design for Phase 2 of the LAMP was completed...
Featured News
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.
|
|||||
Last
$8.27 |
Change
-0.070(0.84%) |
Mkt cap ! $7.736B |
Open | High | Low | Value | Volume |
$8.30 | $8.35 | $8.14 | $30.78M | 3.743M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 184 | $8.27 |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
$8.28 | 38197 | 5 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 70 | 8.270 |
1 | 3175 | 8.220 |
1 | 1000 | 8.200 |
2 | 4000 | 8.190 |
2 | 1307 | 8.140 |
Price($) | Vol. | No. |
---|---|---|
8.300 | 3800 | 2 |
8.320 | 6490 | 2 |
8.340 | 7002 | 1 |
8.380 | 1000 | 1 |
8.400 | 755 | 2 |
Last trade - 16.15pm 04/07/2025 (20 minute delay) ? |
Featured News
LYC (ASX) Chart |
The Watchlist
NUZ
NEURIZON THERAPEUTICS LIMITED
Dr Michael Thurn, CEO & MD
Dr Michael Thurn
CEO & MD
SPONSORED BY The Market Online