LYC lynas rare earths limited

Basic Engineering Design for Phase 2 of the LAMP was completed...

  1. 872 Posts.
    Basic Engineering Design for Phase 2 of the LAMP was completed during the quarter, and the tender process for the engineering, construction, procurement and commissioning contract is underway.

    Thats an extract from the last Qrtly report.(which all Lynasheads have read).

    This after confirming the Sojitz contract was done and dusted..and the money was already being used as per above.
    Phase 1 fully funded by LYC.

    Also after welcoming the IAEA experts involvement.

    We know they are advertising publically for Staff.

    The Malawi site is being refurbished,and arranging connections for water,gas.Drilling to start by 3 rd qtr.

    Concentration plant crushing..Designor ores..after successfull testing lower grade ore processing.

    Anyone would think theres nothing wrong.



 
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.
(20min delay)
Last
$8.27
Change
-0.070(0.84%)
Mkt cap ! $7.736B
Open High Low Value Volume
$8.30 $8.35 $8.14 $30.78M 3.743M

Buyers (Bids)

No. Vol. Price($)
2 184 $8.27
 

Sellers (Offers)

Price($) Vol. No.
$8.28 38197 5
View Market Depth
Last trade - 16.15pm 04/07/2025 (20 minute delay) ?
LYC (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.