Basic Engineering Design for Phase 2 of the LAMP was completed...

  1. 872 Posts.
    Basic Engineering Design for Phase 2 of the LAMP was completed during the quarter, and the tender process for the engineering, construction, procurement and commissioning contract is underway.

    Thats an extract from the last Qrtly report.(which all Lynasheads have read).

    This after confirming the Sojitz contract was done and dusted..and the money was already being used as per above.
    Phase 1 fully funded by LYC.

    Also after welcoming the IAEA experts involvement.

    We know they are advertising publically for Staff.

    The Malawi site is being refurbished,and arranging connections for water,gas.Drilling to start by 3 rd qtr.

    Concentration plant crushing..Designor ores..after successfull testing lower grade ore processing.

    Anyone would think theres nothing wrong.



 
watchlist Created with Sketch. Add LYC (ASX) to my watchlist
(20min delay)
Last
$6.37
Change
-0.190(2.90%)
Mkt cap ! $5.954B
Open High Low Value Volume
$6.53 $6.55 $6.35 $21.07M 3.291M

Buyers (Bids)

No. Vol. Price($)
6 11945 $6.36
 

Sellers (Offers)

Price($) Vol. No.
$6.37 99 1
View Market Depth
Last trade - 16.10pm 08/07/2024 (20 minute delay) ?
LYC (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.