CLR. High capex, high opex project. Such high ash projects,...

  1. 37,911 Posts.
    lightbulb Created with Sketch. 828
    CLR. High capex, high opex project. Such high ash projects, needing big wash plants, will probably never start in the current environment.

    CKA. I may revisit. I have my spreadsheet. Need to confirm/update the data. Production capacity is low due to transport but there coal is good and opex & capex should be low.

    I currently hold AKM. High quality coal. Lowish opex. Infrastructure hopefully coming. Possibly takeover target given it has 19.9& shareholder.
 
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.