Hi exchanger, there are two options as far as existing pipelines.
The closest pipeline is a direct line tto the port of Adelaide which carries gas that has already been processed, (approx 80 klm) This would then need gas to be processed prior to use of the pipeline.
The other option is slightly further away( 125klm) to Moomba where there is already a processing plant in place, from which the gas can then be directed to Gladstone.
They are the 2 options that exist ATM.
- Forums
- ASX - By Stock
- $4 Valuation
Hi exchanger, there are two options as far as existing...
-
- There are more pages in this discussion • 48 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add NRZ (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.4¢ |
Change
0.000(0.00%) |
Mkt cap ! $8.724M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
NRZ (ASX) Chart |
Day chart unavailable