Peoples, I have been out of this for a short while, can someone please inform me what happened to the 3rd wildcat well that was supposed to be drilled in this program ?
From todays announcement.
"The P4 well represented the final well under the drilling contract for Transocean GSF Monitor and the
rig will now be demobilised and released. Rialto can now turn its attention to a full assessment of all of
the data obtained throughout this successful drilling programme.”
Wasnt this a 3 drill program ??
Thanks in advance.
Duke
- Forums
- ASX - By Stock
- 40mcf estimate and petrocci increases stake
Peoples, I have been out of this for a short while, can someone...
-
-
- There are more pages in this discussion • 26 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)