RRL 3.62% $1.86 regis resources limited

Ann: PEA submitted for McPhillamys Gold Project, page-3

  1. 293 Posts.
    lightbulb Created with Sketch. 50
    I found an older announcement from September 2017

    http://www.regisresources.com.au/reports-2/asx-announcements?download=268

    McPhillamys Gold Project - Pre-Feasibility Study
    Regis has undertaken studies to a pre-feasibility level into the development of the McPhillamys Gold Project (MGP) in New South Wales. The study assesses the MGP to an appropriate level to support the estimation of a JORC compliant maiden Ore Reserve and to enable the Regis Board to determine the viability of the project so as to commit to workstreams required to complete a Definitive Feasibility Study (DFS) in the December 2017 quarter.

    == Life of Mine (LOM) Summary
    —>Key life of mine physical results from the study, at a processing throughput of 7Mtpa, are summarised below:

    Mining
    ++ Waste volume (BCM millions). = 91.6
    ++ Ore volume (BCM millions). = 21.3
    ++ Volume total (BCM millions) = 112.9
    ++ W:O Strip Ratio = 4.29

    Milling
    ++ Dry Tonnes Per Hour = 841
    ++ Plant Availability = 95.0%
    ++ Ore Milled (Tonnes millions) = 60.1
    ++ Milled Grade (g/t) = 1.05
    ++ Recovery = 85.0%
    ++ Ounces Recovered = 1,728,264
    ++ Mine life (years) = 9

    The capital cost estimate has been developed for the design and construction of a 7.0Mtpa open cut mine and gold processing facility using all new equipment. The MGP capital cost is estimated at $215 million as summarised below.

    If the 215 Million Aud is correct the question is how could Regis finance this? They have actually 208 Mio Aud Cash.

    Background:
     The MGP is wholly owned by Regis and is located approximately 250 kilometres west of Sydney in the Central West region of New South Wales.

     In 2017 Regis announced a maiden Ore Reserve Estimate at MGP of 60.1 million tonnes at 1.05g/t Au for 2,034,000 ounces of gold.

     Pre-feasibility level studies in 2017 show the MGP is a robust, large scale open pit gold mine with a planned 7 million tonne per annum mining and processing operation producing an average of 192,000 ounces per annum over a ten year mine life.
 
watchlist Created with Sketch. Add RRL (ASX) to my watchlist
(20min delay)
Last
$1.86
Change
0.065(3.62%)
Mkt cap ! $1.404B
Open High Low Value Volume
$1.85 $1.87 $1.83 $9.975M 5.386M

Buyers (Bids)

No. Vol. Price($)
3 20147 $1.85
 

Sellers (Offers)

Price($) Vol. No.
$1.86 149010 9
View Market Depth
Last trade - 16.10pm 31/05/2024 (20 minute delay) ?
Last
$1.85
  Change
0.065 ( 3.32 %)
Open High Low Volume
$1.86 $1.87 $1.83 1304428
Last updated 15.59pm 31/05/2024 ?
RRL (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.