• 130 million tonnes at 0.60% Ni & 0.16% Cu (Measured and Indicated) for 780,000t of contained Ni
• 20 million tonnes at 0.60% Ni & 0.16% Cu (Inferred) for an additional 120,000t of contained Ni
At a planned throughput rate of 6.4 mtpa, to produce 27,000tpa of nickel, this
resource represents over 20 years of mine life.
Pit optimisation studies for the Santa Rita resource were undertaken by independent consultant Croeser Pty Ltd using the following parameters:
• The operating costs from the pit optimisation study announced November 2007 increased by 10%
(representing a 10% reduction in the long term exchange rate to US$:1.80 Real)
• Latest pit slopes as recommended by Brazil-based geotechnical consultants VOGBR
• A nickel price of US$7.00/lb (the same as used in the previous resource estimate)
- Forums
- ASX - By Stock
- MBN
- 45pct open pit resource upgrade for santa rita
45pct open pit resource upgrade for santa rita
-
- There are more pages in this discussion • 16 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add MBN (ASX) to my watchlist
Currently unlisted public company.
The Watchlist
LU7
LITHIUM UNIVERSE LIMITED
Alex Hanly, CEO
Alex Hanly
CEO
SPONSORED BY The Market Online