4DS 0.00% 7.9¢ 4ds memory limited

in IMEC I suspect both will be aware of the situation most...

  1. 4,255 Posts.
    lightbulb Created with Sketch. 8263
    in IMEC I suspect
    both will be aware of the situation
    most projects take 2 runs at a node to hit the mark ( 60nm seems to have been a success first time but we don't know the yield or have access to all outcome data which you would not expect to be privy too)
    https://hotcopper.com.au/data/attachments/6277/6277251-fc5982450299395f7bb05dd69528e6a2.jpg

    first time right success floats at around 31% industry wide as the average
    good thing is as a first run 20nm there is no pressure on time to market / far more important to gain data and design parameters to succeed on that second run at 20nm- IMEC are the experts - they will be all over this potential outcome scenario so imo punters should be ready for it as well
    If things go well a full tape out on a second run may not be needed - it may only require a metal only respin if first run is high quality with exceptional physical design success ( which is quite possible but not likely based on industry practice and outcomes)

    hope this helps - smile.png

 
watchlist Created with Sketch. Add 4DS (ASX) to my watchlist
(20min delay)
Last
7.9¢
Change
0.000(0.00%)
Mkt cap ! $139.3M
Open High Low Value Volume
7.9¢ 8.2¢ 7.8¢ $272.6K 3.436M

Buyers (Bids)

No. Vol. Price($)
2 31689 7.9¢
 

Sellers (Offers)

Price($) Vol. No.
8.0¢ 134953 2
View Market Depth
Last trade - 15.57pm 28/06/2024 (20 minute delay) ?
4DS (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.