CAP 6.00% 9.4¢ carpentaria resources ltd

Well the pump squad is slow arriving...... the only issue with...

  1. 1,812 Posts.
    lightbulb Created with Sketch. 239
    Well the pump squad is slow arriving...... the only issue with this project is the JV, once this is sorted out, i dont think they will have a problem getting it off the ground and i can see it in production in 3-4 years (realistically)

    GLTA.
 
watchlist Created with Sketch. Add CAP (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.