$PUR - Doesn't get any better with $6m EV. Another mineralised...

  1. 13,333 Posts.
    lightbulb Created with Sketch. 93
    $PUR - Doesn't get any better with $6m EV.
    Another mineralised zone....

    ” Mr Read said. “This brecciated fault zone mineralisation is very different to the fine-grained sulphides intersected in holes BB01-17 and B03-17 and our interpretation is that the mineralisation in hole BB04-17 represents remobilised mineralisation from a sedimentary hosted zinc-lead body. However, the thickness of the mineralisation indicates that the brecciated fault zone is now a target in its own right.

    Waiting for Assay results of Hole 1 , Hole 3 & now Hole 4. If +VE this could sitting around $40-60m MC.
 
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.