Another of IRD's welcome regular updates today. I think the best...

  1. 59 Posts.
    Another of IRD's welcome regular updates today. I think the best part of the announcement is on page 2, under the GIP heading:

    "In a single traverse at Northwest Fingerpost Hill 1 magnetite has been replaced by hematite from surface to a vertical depth of 55m. The total width of this hematite zone is estimated at 180m. Magnetite gneiss extends below the hematite by an additional 20-45m."

    The presence of hematite is very encouraging, especially from surface. I'll be keen to see the assays. Even a few such bodies of DSO (or near DSO) quality haematite could mean valuable early cash flow ahead of a magnetite operation, which is another tick in favour of the GIP reaching production.

    I'm afraid, in these situations, I'm prone to "bucket" tonnage calculations, so here goes: 180m width (the traverse?) x 55m (depth) is 9900m2, so if the specific gravity of hematite is ~5g/cc then each 10m slice weighs ROUGHLY 0.5 million tonnes. It wouldn't be a stretch to get 10 or more such blocks over the GIP area (in one pit or satellites), ie 5mt. If they can clear a very conservative US$10/t (after operating and cap costs, stripping etc), that's +US$50m in cash flow, over 5 years say (NPV might be half that). Current fully diluted market cap is ~A$100m with all the options.

    Early days and risky of course, but good news. It looks like the RC program still has several targets to test, after a rest break; we'll all be watching with interest.
 
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.
(20min delay)
Last
2.5¢
Change
-0.001(3.85%)
Mkt cap ! $20.71M
Open High Low Value Volume
2.7¢ 2.7¢ 2.2¢ $19.75K 828.0K

Buyers (Bids)

No. Vol. Price($)
1 90000 2.3¢
 

Sellers (Offers)

Price($) Vol. No.
2.5¢ 99999 1
View Market Depth
Last trade - 16.10pm 27/06/2025 (20 minute delay) ?
IRD (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.