ARQ announcment today didn't contradict previous estimates of 5,000 BEFORE Hovea-5-6-7 was to be put on production so ..... with this new well, i believe they should be producing at least 6,500 BOPD. Water injection will probably be needed to maintain this.
6,500 BOPD * A$28/BBL * 50% = A$91,000 day, or $2.7M month or A$32M year .. this is nearly the same as AWE Bassgas project! .. from ONE field!
NPV could fall to $20/BBL though with lower oil prices and stronger A$.
NPV = ((US$30 - US$5) / 0.6) * 0.667 = A$28, where production costs = US$5 and exchance rate 60c.
Interesting H7 found a gas cap, meaning H1 didn't intersect the crest.
- Forums
- ASX - By Stock
- 5GN
- 6,500 + bopd
6,500 + bopd
-
- There are more pages in this discussion • 1 more message in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add 5GN (ASX) to my watchlist
(20min delay)
|
|||||
Last
13.8¢ |
Change
-0.003(1.79%) |
Mkt cap ! $42.37M |
Open | High | Low | Value | Volume |
14.0¢ | 14.0¢ | 13.8¢ | $3.905K | 28.34K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
9 | 868703 | 13.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
14.0¢ | 126771 | 8 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
8 | 668703 | 0.135 |
3 | 506025 | 0.130 |
1 | 250000 | 0.125 |
2 | 18189 | 0.110 |
1 | 9533 | 0.105 |
Price($) | Vol. | No. |
---|---|---|
0.140 | 81571 | 4 |
0.145 | 639762 | 6 |
0.150 | 1565482 | 22 |
0.155 | 1994805 | 22 |
0.160 | 527326 | 9 |
Last trade - 15.42pm 13/09/2024 (20 minute delay) ? |
Featured News
5GN (ASX) Chart |
The Watchlist
LPM
LITHIUM PLUS MINERALS LTD.
Simon Kidston, Non--Executive Director
Simon Kidston
Non--Executive Director
SPONSORED BY The Market Online