ARQ announcment today didn't contradict previous estimates of 5,000 BEFORE Hovea-5-6-7 was to be put on production so ..... with this new well, i believe they should be producing at least 6,500 BOPD. Water injection will probably be needed to maintain this.
6,500 BOPD * A$28/BBL * 50% = A$91,000 day, or $2.7M month or A$32M year .. this is nearly the same as AWE Bassgas project! .. from ONE field!
NPV could fall to $20/BBL though with lower oil prices and stronger A$.
NPV = ((US$30 - US$5) / 0.6) * 0.667 = A$28, where production costs = US$5 and exchance rate 60c.
Interesting H7 found a gas cap, meaning H1 didn't intersect the crest.
- Forums
- ASX - By Stock
- 6,500 + bopd
ARQ announcment today didn't contradict previous estimates of...
-
- There are more pages in this discussion • 1 more message in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add 5GN (ASX) to my watchlist
|
|||||
Last
15.0¢ |
Change
0.000(0.00%) |
Mkt cap ! $46.96M |
Open | High | Low | Value | Volume |
15.0¢ | 15.3¢ | 15.0¢ | $86.66K | 577.7K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
11 | 4670865 | 15.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
15.5¢ | 1548308 | 24 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
11 | 4670865 | 0.150 |
5 | 1830344 | 0.145 |
4 | 164180 | 0.140 |
4 | 32228 | 0.135 |
2 | 15398 | 0.130 |
Price($) | Vol. | No. |
---|---|---|
0.155 | 1548308 | 24 |
0.160 | 698265 | 14 |
0.165 | 263584 | 8 |
0.170 | 504284 | 5 |
0.175 | 52258 | 3 |
Last trade - 16.10pm 12/07/2024 (20 minute delay) ? |
Featured News
5GN (ASX) Chart |