ddzx
You say "the problem with the stock is the fundamentals in the PFS (22/8/12) seem kind of poor
the opex is $2.71/lb before gold & silver credits
$1.16/lb with gold & silver credits
the upside case is double the JORC & earn pre-tax $155m free cash flow
if there are 700m shares on issue, that is 15.5 cents cash per share earned after 9 years of mining (on 30% tax rate)
currently $39M in accumulated loss so that is all of the tax if the Mexican allow it
$155m cash flow/700m shares = 22 cents per share over mine life
that is assuming 100% debt funding for the CAPEX"
The company say......
Promontorio – Positive PFS Results ( before last results were known)
Current Prices (@ 20/11/2012)
Cu @ US$3.50/lb
Au @ US$1,720/oz
Ag @ US$32.30/oz
ITEM RESULT
Mine Life 4.5 Years
Capex US $34.5 Million
Gross revenue US $174 Million
Free cash US $63 Million
cash costs US $0.96 / lb Copper
Upside Case
Promontorio – Upside Case
Upside Case uses Current Prices with double the Mining Inventory. All other parameters remain unchanged.
Exploration Target – initially double the mineral resource to: 1Mt @ 4 - 5% Cu 2g/t Au 100g/t Ag
ITEM RESULT
Mine Life 8.8 Years
Capex US $34.5 Million
Gross revenue US $414 Million
Free cash US $174 Million
C1 cash costs US $0.83 / lb Copper
maybe you can tell us where the company is wrong about its costs and why they are wrong about claiming they have 551m share on issue versus your claim they have 700m on issue.
Flux
- Forums
- ASX - By Stock
- AZS
- 6 million buyer
6 million buyer, page-27
-
- There are more pages in this discussion • 10 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add AZS (ASX) to my watchlist
Currently unlisted public company.
The Watchlist
EQN
EQUINOX RESOURCES LIMITED.
Zac Komur, MD & CEO
Zac Komur
MD & CEO
SPONSORED BY The Market Online