''should Snowy 2 be abandoned? just write off the cost as a waste of time and effort?''
IF the current problem tunnel is not doable -------------- one has to wonder if rerouting is possible?
after all, if you want to build a fence and you have a patch of pure slop - you shift the fence over a bit to dry firm ground ----------- I'm not offering any expert opinion, but I wonder if there's a plan B possibly
it's a big deal to cut the loss and run on a major project
- Forums
- Political Debate
- 7 nuclear power plants for Aus - go LNP!
''should Snowy 2 be abandoned? just write off the cost as a...
-
- There are more pages in this discussion • 336 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Featured News
The Watchlist
FHE
FRONTIER ENERGY LIMITED
Adam Kiley, CEO
Adam Kiley
CEO
SPONSORED BY The Market Online