7 nuclear plants at the cost as estimated by CSIRO and IEA at $8Bn + per plant is $56Bn..... and thats before they ***kup the design and engineering as they've done with Snowy 2.
- Forums
- Political Debate
- 7 nuclear power plants for Aus - go LNP!
7 nuclear plants at the cost as estimated by CSIRO and IEA at...
-
- There are more pages in this discussion • 274 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Featured News
The Watchlist
HAR
HARANGA RESOURCES LIMITED.
Peter Batten, MD
Peter Batten
MD
Previous Video
Next Video
SPONSORED BY The Market Online