Merv, the time lines for building the reactors ,is so ridiculous, its not even funny;
Dutton said a future Coalition government would start by building either small modular reactors – which are not yet in commercial production – or a large-scale reactor. He said the small reactors could be operating by 2035, while the larger would produce electricity by 2037.
Just how would this be possible?
Raider
- Forums
- Political Debate
- 7 nuclear power plants for Aus - go LNP!
Merv, the time lines for building the reactors ,is so...
-
- There are more pages in this discussion • 298 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)