Merv, the time lines for building the reactors ,is so ridiculous, its not even funny;
Dutton said a future Coalition government would start by building either small modular reactors – which are not yet in commercial production – or a large-scale reactor. He said the small reactors could be operating by 2035, while the larger would produce electricity by 2037.
Just how would this be possible?
Raider
- Forums
- Political Debate
- 7 nuclear power plants for Aus - go LNP!
Merv, the time lines for building the reactors ,is so...
-
- There are more pages in this discussion • 235 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Featured News
The Watchlist
FHE
FRONTIER ENERGY LIMITED
Adam Kiley, CEO
Adam Kiley
CEO
SPONSORED BY The Market Online