LYC 2.73% $6.40 lynas rare earths limited

TraderV,don't get me wrong.. I'm no Engineer.. I'm medical but...

  1. 3,981 Posts.
    lightbulb Created with Sketch. 217
    TraderV,

    don't get me wrong.. I'm no Engineer.. I'm medical but have been embedded in this 1.5B hospital construction for a few years now and it is slowly drawing to a close (hopefully)... another 4 months and it will be ready for handover (in theory)... another 6 months and we might be allowed to actually move in ($$ are tight).

    Completion/handover date is still 100% important to the construction company (they get a very nice bonus if they finish early and a penalty if they finish late)... however it is the physical and functional measures we really care about when we are given a % completion ... the time deadline ticks away regardless of other matters (strikes/rain/accidents/supply issues/Haystings electrical folding)... the time measure is no real metric in the real world of how complete the project actually is other than a rod on the back of the construction company.

    Cheers,
    R
 
watchlist Created with Sketch. Add LYC (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.