GAS 3.57% 13.5¢ state gas limited

Ann: Gas flow-rates at 358k scft/day triggers a strategy review, page-3

  1. 3,252 Posts.
    lightbulb Created with Sketch. 40
    Rougemont gas flow-rates at 358,000 scft/day triggers a review of
    strategy
    HIGHLIGHTS:
    • Rougemont production testing well continues to demonstrate excellent gas production
    • State Gas now pursuing rapid certification of reserves to underpin construction of gas
    pipeline
    • The Rolleston West Project (100% owned) is in a highly productive area, producing export
    quality gas from the well-understood Bandanna coal measures
    State Gas Limited (ASX: GAS) (“State Gas” or “the Company”) is pleased to advise that production testing
    gas from the Rougemont2/3 lateral well (“Rougemont”) is flowing at a rate that is approaching being
    unquestionably economic. It is producing in excess of 350,000 scft/day with the flowrate increasing at
    between15-20,000 scft/day (see Figure 1 below), despite the top coals of the Bandanna coal measures
    remaining underwater. If Rougemont gas production continues to increase at this rate it would justify
    temporarily relocating the relocatable CNG project compression assets from Reid's Dome to Rougemont.
    The advantages of such a move would be that the company would produce a positive cashflow from
    otherwise flared gas whilst preserving the conventional gas at Reid's Dome as a quick response to what
    should be an increasingly volatile domestic gas market following the closure of the Liddell coal fired power
    station in April. Whilst such a move may cause a slight delay in the commencement of the CNG project, its
    gas would still be available for the winter electricity needs following the Liddell closure.
    The early success of the Rougemont Production Test means the company is evaluating the quickest
    method by which it can get reserves declared at Rougemont to underwrite the financing of an approximately
    20 km pipeline to a connection on the Wallumbilla to Gladstone Pipelines.
    The options for a quick reserve certification range from a three to five well pilot scheme to pressure
    monitoring wells or a combination of both. A decision on the precise next steps to be undertaken this dry
    season will be made after discussions with the reserve certifier this month.
    2
    Figure 1: Daily gas production
    Figure 2: Relocatable Compression Station for Reid Dome CNG Project – can be repurposed to support CSG from Rolleston West
    0
    50
    100
    150
    200
    250
    300
    350
    400
    450
    500
    Gas Rate (mscfd)
    Water Rate (bwpd)
    Rougemont 2/3 Pair Daily Gas Production (mscfd/day)
    Gas Rate
    3
    This announcement was approved for release by the Board of Directors.
    FOR FURTHER INFORMATION
    Richard Cottee
    Executive Chairman
    Phone: 0458 517 850
    Email: [email protected]
    Doug McAlpine
    Chief Executive Officer
    Phone: 0488 007 889
    Email: [email protected]
    www.stategas.com
    ABOUT THE ROLLESTON WEST PROJECT
    The Rolleston West Project (ATP 2062), is 100% owned by State Gas Limited and is directly adj
 
watchlist Created with Sketch. Add GAS (ASX) to my watchlist
(20min delay)
Last
13.5¢
Change
-0.005(3.57%)
Mkt cap ! $37.02M
Open High Low Value Volume
13.0¢ 14.0¢ 12.5¢ $35.51K 267.0K

Buyers (Bids)

No. Vol. Price($)
5 344467 12.5¢
 

Sellers (Offers)

Price($) Vol. No.
14.5¢ 71671 1
View Market Depth
Last trade - 16.10pm 07/06/2024 (20 minute delay) ?
Last
13.0¢
  Change
-0.005 ( 7.14 %)
Open High Low Volume
13.0¢ 14.0¢ 13.0¢ 93817
Last updated 15.51pm 07/06/2024 ?
GAS (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.