    Thought I'd post the first 1/4 activity report just released as there is some stuff in there I wasn't aware of..

    Cheers,

    Ann. follows...

    • Placement of 24.3 million shares raises $42.9 million of which 13.3 million share issue is to
    be ratified at 10 May EGM
    • Oxidised resources increased to 9.37 million tonnes with further increases expected
    • Purchase of grinding circuit completes acquisition of major second hand equipment for
    Browns Oxide Project.
    • PER assessment by NT imminent following lodging of further information as per EPA's
    request
    • Browns Oxide Project site work to begin as soon as wet season is over
    • Major 35,000 metre drill programme ready to begin as soon as rigs can access drill sites.

    Capital Raising
    The capital cost of the Browns Oxide Project and funding of the accelerated base
    metals/uranium/gold exploration programme in 2006 is now substantially covered by proceeds from
    the placement of 24.3 million shares at $1.85 per share with two New York based investment funds
    (Harbinger Capital and Citadel Investments each subscribing for 11 million shares) and two smaller
    Hong Kong based groups (2.3 million shares).
    Eleven million shares have been issued and funds received. The issue of the balance of 13.3 million
    shares requires shareholder approval in accordance with ASX Listing Rules. An EGM is set for
    10 May seeking the required shareholder approvals.


    PROJECT DEVELOPMENT
    Browns Oxide Project (BOP)
    Development of the Browns Oxide Project continues, with all major items of second-hand
    equipment now purchased. The purchase of the grinding and classification circuit adds to the
    earlier purchase of the Cawse solvent extraction and electrowinning plant and a number of
    thickeners and tanks. The bulk of the remaining items of equipment including critical items of
    equipment such as the stirred leach tanks are being custom designed and will be fabricated in
    appropriate corrosion resistant materials.
    Extra manpower has been added to the team completing the +/-15% project construction control
    estimate. This work is being directed by Len Spencer and led by BeMeX Engineers. Work on site
    is scheduled to commence immediately the ground dries out after what has been a rather late wet
    season. It was fortuitous that Tropical Cyclone Monica did not affect the project other than with
    substantial rainfall.
    The extra information requested for the assessment of the Public Environmental Report (PER) and
    reported in our announcement to the ASX on 15 March has been provided to the NT Environmental
    Protection Agency. Completion of their PER assessment is imminent. Following sign-off of the
    PER by the NT Minister for the Environment, the assessment will be reviewed by the
    Commonwealth under their bi-lateral agreement with the NT.
    Browns Oxide Project Resource Drilling
    Updated oxidised resources of 9.37 million tonnes were reported to the ASX on 19 April. Details
    of these are noted elsewhere in this report, but significantly they demonstrate that mining of oxide
    ores, subject to further environmental approvals, can continue at 1 million tpy for a total of at least
    10 years.


    Utilities
    Compass continues to work closely with the NT Government and the Coomalie Council to ensure
    that all utilities, particularly electric power for the Browns Oxide Project, will be available as
    required for project start-up.


    EXPLORATION – NORTHERN TERRITORY (Compass Resources 90%:Guardian Resources
    Pty. Ltd. 10%)
    During the period, compilation and analysis of last year's drill data was undertaken together with
    planning of the 2006 exploration programme. The 2006 programme is expected to include at least
    30,000m of RC drilling and 5,000m of diamond drilling. Three drill rigs (two RC, one diamond)
    have been contracted and are expected to commence drilling in mid to late May. The late finish to
    the wet season should not have a significant effect on the drill programme which will run
    throughout the entire field season.


    URANIUM EXPLORATION
    Four new tenements were granted to Compass (90%) and Guardian Resources (10%) during the
    quarter, mostly covering high quality uranium prospects with encouraging and ore grade
    intersections. In the southern Waterhouse area these are EL 24464 which includes the Kylie, Spring
    Creek and part of the Kylie South uranium prospects, and adjoining EL 24770 which contains part
    of the Kylie South prospect and an unnamed copper prospect.
    West of Batchelor, the new EL 24472 contains part of the Area55WW lead prospect and the new
    tenement designated AN 23439 includes the Rum Jungle Creek South mine (the largest uranium
    producer in the Rum Jungle Field) and its northern extension, now known as the NX Prospect.
    Mt Fitch Uranium Prospect.
    This prospect was originally located in the early 1950’s and drilled by the BMR and three separate
    Companies. Data compilation was completed during the period using Compass’ and all previous
    explorers’ drill and assay data. This resulted in a total of over 5,500 sample intervals containing
    uranium and/or copper values being tabulated. This assay data, together with location and lithology
    data has been assembled as input to ore resource estimation which is currently in progress.
    Planning of the 2006 drill programme is currently well advanced, with the location of up to 30 holes
    being finalised.
    RJ East Prospect
    This prospect is located between the old Whites and Dysons Uranium mines. It contains the same
    rock sequences that host the previously mined uranium ores. The location of new drill holes to more
    fully evaluate this highly prospective area is currently being finalised.
    RJCS and NX Prospect
    The tenement which covers this prospect and the nearby Rum Jungle Creek South mine (the biggest
    and richest of the old uranium mines) was granted during the period. The NX prospect covers
    extensions to the north of the previously mined part of the orebody, and as such it is classified as
    having excellent potential to host economic grade mineralisation. Planning of drill holes at this
    prospect is currently in progress and will include redrilling in areas where good grade
    mineralisation was reported.


    CMR 2006-March Quarterly Report 4
    Kylie and Kylie Southeast
    With the granting of the tenements covering these 2 prospects, planning of further drill evaluation
    of the area is underway. This area is considered to be particularly prospective for uranium
    mineralisation as it is located close to the Middle Proterozoic unconformity and associated with
    reverse faulting. Previous drilling has intersected high grade mineralisation at both prospects, which
    remain as the first priority areas for evaluation this year.


    BASE METAL EXPLORATION
    An update of the Companies oxidised resources was completed and released during the quarter with
    an increase in tonnage of approximately 40%, 28% in contained copper, 29% in contained cobalt
    and 31% in contained nickel.
    The Browns oxide resource was re-estimated with the data from the 62 holes completed in 2005
    added to the database. Using the same cut off grades, the tonnage of oxide copper tonnage was
    slightly reduced, mainly due to some deeper oxidised ores being reclassified as transition ore type.
    Offsetting this was a much better separation and definition of the copper and the lead oxide
    material, increasing the oxide lead resource by 27%.
    At the Area 55 prospect a re-estimation was completed following better definition of the oxidesulphide
    boundary and the use a number off cut off grades. This resulted in a substantial increase in
    tonnage, more than doubling the size of the oxidised resource.

    The planning of the major 2006 drill programme is being finalised at both advanced and greenfields
    prospects. This will include holes planned specifically for lead and/or copper and/or zinc sulphide
    mineralisation.
    CMR 2006-March Quarterly Report 5
    Browns Deposit
    Near the centre of this deposit, Compass’ deepest diamond drill hole is also its best hole; the
    intersection in hole 01BD02 recorded 63 metres from 392 metres grading 11.94% lead, 0.108%
    cobalt, 0.059% nickel and 25g/t silver. This included a 35 metre high grade zone from 420 metres
    grading 15.68% lead, 0.113% cobalt, 0.096% nickel and 28 g/t silver.
    It is planned to drill three additional deep holes in the vicinity of hole 01BD02, intersecting the
    mineralised horizon 60 metres to the east and west, and also 60 metres immediately below. These
    holes have the potential to significantly increase the lead resource. Two follow up holes have also
    been planned.

    With the significant increase in the world price of zinc, the western portion of the Browns Deposit,
    previously not drilled by Compass will be targeted to assess its zinc potential. Intersections in this
    area include the following from holes drilled in 1956:
    Hole 56B14 12.5 metres from 37.5 metres grading 4.81% zinc and 17.7 metres from 57.6 metres
    grading 3.92% zinc,
    Hole 56B16 4.6 metres from 125 metres grading 4.80% zinc and 12.2 metres from 182.9 metres
    grading 4.35% zinc.
    A series of 9 RC holes has been planned to more fully delineate zinc rich mineralisation in the top
    150 metres of this area. These holes will also be extending the infill drilling of the lead resource
    another 150 metres to the west. Should sufficient encouragement be obtained, deeper follow up
    diamond drilling will be undertaken.

    EXPLORATION – NEW SOUTH WALES
    Tomingley West (EL 6080) Ironbark (EL 6090) (Compass 100%)
    Plans are well advanced to commence diamond drill evaluation of gold prospects within these
    tenements. The drill rig booked to undertake this work is anticipated to commence drilling in June.
    In the Ironbark EL, induced polarisation (IP) anomalies will be drilled at both the Croakers and
    Styles gold prospects. At the Tomingley West EL a series of RC and diamond drill holes will be
    completed at the Bogan East prospect where very encouraging gold intersections were obtained
    from air-core drilling.
    Trewilga Project EL 5675 (Compass Royalty Interest)
    At the Trewilga Project east of the Tomingley West EL, total announced resources for the
    Wyoming gold deposits stands at 7.13Mt grading 2.70g/t gold (607,400 ounces gold). The great
    majority of this resource is subject to a Compass Royalty.
    Alkane reported this quarter that the revised geological and resource model for the Wyoming one
    deposit is nearing completion, and includes the results of last year's extensive diamond core drilling
    program. This revised model is being incorporated into the feasibility study for the optimal
    development of the Wyoming deposits. The conceptual development remains as a 500,000 tonnes
    per annum open pit operation followed by underground mining at 250,000 tonnes per annum, with a
    conventional carbon-in-leach gold recovery circuit.
    The gold exploration potential of the area has been further demonstrated by an east west line of aircore
    holes over a sub-circular Caloma aeromagnetic anomaly (located 800m north east of Wyoming
    one) which intersected alteration and veining similar to that hosting the mineralisation at Wyoming.
    CMR 2006-March Quarterly Report 6
    Hole PE046 intersected 6m grading 1.95g/t gold from 12metres depth and 6m grading 1.42g/t gold
    from 60m. Follow up drilling has located similar alteration and veining 100m to the north although
    assay results are not yet available.
    The Compass royalty interest in the Trewilga tenement (that covers the Wyoming and the Caloma
    prospects and a substantial surrounding area) comprises “75 cents per dry tonne of ore treated for
    the first 500,000 tonnes, thence 3% of gold and other minerals recovered until 150,00 ounces are
    produced, thence 5% of gold and other minerals recovered.”

    Alectown East JV ELs 4752/6264 (Compass 13.3%), ELs 5563/6265, (Compass 23.4%)
    Newcrest Mining Limited have advised that a 332m diamond core tail (hole RCDAT058) was
    completed in March at the Buryan prospect in EL 4752. This core drilling intersected altered
    volcanics and diorites. Quartz-carbonate ± prehnite porphyry-style veining was observed but with
    only minor pyrite-chalcopyrite vein mineralisation. Assay results are awaited.
    In addition 19 air-core holes were completed in EL5563 and one in EL4752 (totalling 916m) to test
    various magnetic and gravity features away from the known mineralisation. Seven holes intersected
    Ordovician igneous basement rocks whilst the other 13 intersected deeply weathered sediments
    thought to belong to the Cotton Formation. Assay results are awaited.

    Cuttaburra (EL 6224) (Compass 80%)
    The same rig as mentioned above will also be used to evaluate a bedrock conductor (defined by an
    EM survey) which is associated with a magnetic anomaly within this tenement. The anomaly
    selected constitutes a base metal target of the Cobar type in an area with no outcrop and not
    previously explored.