    So 300m below would take it to around the 500 fault area (1945 level) and 600m offset would take roughly 240 days to develop a drive to. Drive would be waste so therefore non profitable truck hauls to the surface, will need to raise more cash for this at a guess. Good news for the company but still something seems a bit odd.
 