I am a shareholder and I want them mining asap.
No interuptions
Might make another vist to check the volume and % of the diff stockpiles.Good veiwing
With mining underway and a significant stockpile inventory building, a sophisticated ore and stockpile management plan is being implemented.
The characteristics of stockpiled ore are dictated by Process Plant requirements, which the pit geologists use to determine ore segregation logistics based on both species and grade categorisation. The goal is to be capable of presenting the various ore types and grades to the ROM when and as required.
- Forums
- ASX - By Stock
- CDU
- 88.8 cu
88.8 cu, page-8
-
- There are more pages in this discussion • 28 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add CDU (ASX) to my watchlist
Currently unlisted public company.
The Watchlist
EQN
EQUINOX RESOURCES LIMITED.
Zac Komur, MD & CEO
Zac Komur
MD & CEO
SPONSORED BY The Market Online