A call with Investor Relations, page-102

  1. 1,904 Posts.
    lightbulb Created with Sketch. 1101
    No - Troopy is saying the opposite.

    He is saying that hx CAN'T do weep holes - even when not needed - and in any case as hx does leaves gaps between blocks then the weepholes are there by default.
    Look at this post from Troopy: https://hotcopper.com.au/posts/74538046/single

    Just about nothing there is right.
    He also says hx cant do control joints - he is not smart enough to realise it is as simple as the CAD model showing two separate wall sections on each side of the spot where the joint is needed.

    and he says the vertical rio cant be fixed to the slab - an interesting thing is that a CRH subsidiary actually makes the steel components that are fixed in the slab, and have a fitting to screw in the long rods.

    And he said flashing cant be done - but it doesnt seem to bother the Florida builders.

    Troopy may well know the building code off by heart, but does not understand it, hence he is unable to comprehend how a different technique can produce the required tesult.


    Last edited by Giobria: 21/04/25
 
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.
(20min delay)
Last
0.5¢
Change
0.000(0.00%)
Mkt cap ! $28.44M
Open High Low Value Volume
0.5¢ 0.6¢ 0.5¢ $222.8K 44.30M

Buyers (Bids)

No. Vol. Price($)
95 38723383 0.5¢
 

Sellers (Offers)

Price($) Vol. No.
0.6¢ 12350719 29
View Market Depth
Last trade - 16.10pm 20/06/2025 (20 minute delay) ?
FBR (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.