RLT 4.17% 80.5¢ renergen limited

A couple of videos, page-3

  1. 3,871 Posts.
    lightbulb Created with Sketch. 923
    FHC a Phase 3 would be great.

    Phase 2 isn’t meant to be operational till 2026/27 so I wonder if they can sort out something for a Phase 3 in the interim and build it concurrently to the Phase 2.. Or if it'll be awhile away if it does eventuate..

    Plenty of immediate demand today for nat gas / LNG in South Africa given load-shedding for gas to power etc..

    And on the helium side Stef has been in Texas with plenty of major helium users nearby such as semiconductor plants and the space industry etc..

    Plus of interest the potential SEZ - Special Economic Zone with lower tax rates for Renergen might help incentivise further investment for a Phase 3 potentially



    https://hotcopper.com.au/data/attachments/5854/5854795-e0699b4dd182b414e548e0e7df8f84ec.jpg
 
watchlist Created with Sketch. Add RLT (ASX) to my watchlist
(20min delay)
Last
80.5¢
Change
-0.035(4.17%)
Mkt cap ! $24.41M
Open High Low Value Volume
84.0¢ 84.0¢ 80.5¢ $10.73K 12.97K

Buyers (Bids)

No. Vol. Price($)
2 11000 80.0¢
 

Sellers (Offers)

Price($) Vol. No.
84.0¢ 4000 1
View Market Depth
Last trade - 16.10pm 03/06/2024 (20 minute delay) ?
Last
81.0¢
  Change
-0.035 ( 4.14 %)
Open High Low Volume
84.0¢ 84.0¢ 81.0¢ 5097
Last updated 15.29pm 03/06/2024 ?
RLT (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.