Good analysis, I did a back of envelope calculation.
If we assume:
the average height of mineralisation: 300m
the average width: 300m
the length: 650m
The density of the corbonitite: 2.7
We get 300*300*650*2.7= around 158 million tonnes of ore at around 2.5%. Double the height, we have 315 million tonnes.
The breccia zone has half the grade (may be less), but it seems like it will add around 50% more to the tonnage.
- Forums
- ASX - By Stock
- LIN
- A globally significant project
A globally significant project, page-3
- There are more pages in this discussion • 177 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add LIN (ASX) to my watchlist
(20min delay)
|
|||||
Last
11.0¢ |
Change
0.005(4.76%) |
Mkt cap ! $126.8M |
Open | High | Low | Value | Volume |
11.0¢ | 11.0¢ | 10.5¢ | $121.4K | 1.110M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 171130 | 11.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
11.5¢ | 271295 | 6 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 171130 | 0.110 |
5 | 1030635 | 0.105 |
7 | 222777 | 0.100 |
1 | 100000 | 0.099 |
1 | 200000 | 0.096 |
Price($) | Vol. | No. |
---|---|---|
0.115 | 271295 | 6 |
0.120 | 350088 | 8 |
0.125 | 307147 | 3 |
0.130 | 382601 | 6 |
0.135 | 364628 | 6 |
Last trade - 16.10pm 07/06/2024 (20 minute delay) ? |
|
|||||
Last
11.0¢ |
  |
Change
0.005 ( 2.33 %) |
|||
Open | High | Low | Volume | ||
11.0¢ | 11.0¢ | 10.8¢ | 479996 | ||
Last updated 15.46pm 07/06/2024 ? |
Featured News
LIN (ASX) Chart |